Project Details :
Loading and unloading is done manually and waste is transported through open trollies. However, the city is not properly equipped with solid waste handling or transportation equipments. The transporting vehicles are generally opened during transportation.Solid waste collection and disposal in the town is the responsibility of Nagar Parishad. But there is no form of organized solid waste management system in the town. The total waste generation in the town is about 3.19 metric tons per day. Collection bins are present in the town. Solid waste collection is done by the sweepers of the Nagar Parishad. At most places waste lies on the roadside and lowlands. There are no organized places of solid waste disposal. Segregation is not practiced and collection is made from bines placed at various locations within the town.
* To provide separate dust Bins for segregating solid waste.
* To ensure 100% door to door collection system.
* To provide appropriate vehicles for transportation of solid waste.
* Develop scientifically designed land fill site for proper disposal of solid waste including segregation of waste.
* Development of Sanitary Landfill Site.
Note: Please Download Project Document attached with this Project for more Information.
|