Project Detail :
The Company Has Proposed To expand their manufacturing unit at 175/1, 175/2, 176, 177, 178, 179/1, 179/2, 179/3, 182/1, 182/2, 183/1, 183/2, 184, 185/1, 185/2, 185/3 185/4, 185/5, Village :Samkhiyali, Taluka: Bhachau, Distt: Kutch, Gujarat by manufacturing MS Billets/SS Billets of 79,200 TPA. The land requirement is 0.5 acres which is already available within the existing premises of 116 acres. In the existing premises, there is a captive power plant of 12 MW capacity for which was granted EC by the Ministry vide letter no. J-13011/37/2007-IA-II(T) on 28.9.2007. Thereafter, the proponent has obtained another EC from the Ministry vide letter no.J-11011/231/2009-IA.II(I) dated 8.6.2009 for the expansion of sponge iron (5250 MT/MONTH), WHRB (2MW) and AFBC (5 MW). Public Hearing for this project was conducted during 2007. The raw materials required are sponge iron (55000 TPA) and scrap (35000 TPA). The water requirement for the proposed expansion is 182.7 KLD. No Forest land is involved. No National Park/ Wildlife Sanctuary exists within 10 km radius of the project site. No court cases/litigation is pending
against the project. Project cost is Rs. 15 crores.
Note : Please Download Project Document Attached With This Project For More Information.
|